ADMINISTRATIVE HEADQUARTERS OF THE NATIONAL AUTHORITY FOR MANAGEMENT AND INVESTMENT







Project information:
– Client: Armed Forced.
– Consultant: Engineering Department.
– Main Contractor: I Build Construction.
– Scope of work: Civil, Architecture and MEP works.
– Cost: 35M EGP.
– Time: 6 Months.
Project description:
With a total area is 2400 Sqm, total of 4th and 5th floors inside Al-Masa New Capital
building.
1. Civil & Arch. works.
• Completion of Securit Glass and installation of Walnut veneer wood partitions and arrow veneer wood.
• Completion of all wall painting and ceiling grids required for all building floors.
• Completion of all architecture work including Gibson board, ceiling tiles, Marble
flooring & Hdf flooring and architecture elements.
• Completion of raised flooring for data center room.
2. MEP works.
• Completion of fire alarm system as per NFPA72 including smoke detectors, cables,
sounder, manual call point and fire alarm control panel “FACP”.
• Completion of firefighting system as per NFPA 14 including all pipes, FHCs and
firefighting valves.
• Completion of HVAC system including central ventilation and AC system contains
of split units as per ASHRAE and SMACNA standards.
• Completion of Plumbing systems including all water supply and drainage network and accessories.