Project information:

– Client: ENZA .

– Consultant: EMMAR .

– Main Contractor: ADCON.

– Scope of work: MEP.

– Cost: 10 M EGP.

– Time: 4 MONTH.

Project description:

Our project contains of supplying and installation of MEP works including fire fighting ,
plumbing , HVAC and electrical works for ENZA contains of 900 sqm .
1. Firefighting works
2. HVAC works
3. Plumbing works
4. Electrical works
5. Fire & Life safety works.
• Completion of fire alarm system as per NFPA72 including smoke detectors, cables,
sounder, manual call point and fire alarm control panel “FACP”.
• Completion of firefighting system as per NFPA 14 including all pipes, FHCs and
firefighting valves.
• Completion of HVAC system including central ventilation and AC system contains
of split units as per ASHRAE and SMACNA standards.
• Completion of Plumbing systems including all water supply and drainage network
and accessories.